INSTALLATION


1

2

3

4

5

6

7

8
   
1. The pool layout is carefully marked for precision.
2. The dig begins the process for perfection.
3. The hole is carefully prepared to achieve proper shape and depth.
4. Now that the parameters are correct, the pool is ready to be set in place.
5. The timely process of filling the pool with water begins.
6. The proper plumbing and electrical equipment is installed.
7. The concrete is poured around the pool and its foundation.
8. Your lifetime guaranteed Viking Pool.